Daou Technology Prepares for the Future with a Hyperscale Data Center.

 

We are excited to share the news about Daou Technology's first hyperscale colocation data center in the Seoul metropolitan area. This project serves as a critical infrastructure to meet the rapidly growing IT demands of the digital era, with completion targeted for 2026.

 

The Epicenter of the Hyperconnected Era: A New Beginning for a 40MW Hyperscale Data Center.

The Daou Data Center is a state-of-the-art facility designed to support up to 40MW of IT load, fully equipped to handle AI-driven applications, cloud services, and hyperscale computing. Tailored solutions will cater to hyperscalers, enterprises, and tech innovators, ensuring scalability and reliability to meet diverse client needs. With a focus on sustainable, energy-efficient design, the center will minimize environmental impact while delivering stable, seamless performance for even the most demanding workloads.

More than just an IT infrastructure, the Daou Data Center will serve as a central hub for AI and cloud innovation. Through this project, Daou Technology is committed to pursuing sustainability and innovation, setting a new standard for the data center industry. Upon its completion in 2026, the Daou Data Center will redefine hyperscale data centers in Korea and beyond, shaping the future of IT infrastructure.

Stay updated on the progress of Daou Data Center construction below! Join us in every step of this cutting-edge hyperscale data center journey. We appreciate your continued interest and support!

 

Drone Photos of the Daou Technology Data Center Construction Site

Currently, the data center is in the early stages of construction, focusing on civil engineering works. This essential phase lays the groundwork for a stable and secure structure, ensuring both soil stability and structural integrity. These efforts are critical to successfully advancing the foundation work for the data center. In particular, reliable civil engineering ensures the quality of subsequent building and equipment installation, making it a vital step in the construction process.




At the construction site, you can see the installation of retaining walls to prevent soil erosion and collapse during underground excavation. Additionally, retaining wall panels are being installed around the data center structures to prevent soil loss and reinforce the site boundaries.



The above work is part of the foundation and site stabilization phase for the data center. It includes SRC waterproofing construction to protect the underground facilities of the data center from groundwater and external moisture while maintaining site stability.




The excavation and earth retaining plate installation work for the lower levels involves creating space for the underground facilities and structures of the data center. This critical task includes installing retaining plates to prevent soil collapse during excavation. Additionally, through the ongoing construction updates, you can observe the earth anchor drilling and waler installation work, which enhance the stability of the excavation surface and ensure operational safety.

Daou Technology’s data center project is just getting started. Stay tuned for more updates coming soon!

 

Content is protected by copyright law and is owned by Daou Technology Inc.

It is prohibited to modify or commercially use this content without prior consent.

Featured images via gettyimages.

 

References

1.   -